Property & budget assessment
Tell us where your property is, what you want your ADU to do, and the budget you have in mind. Available space, access and site conditions shape the next conversation.
FOR CALIFORNIA HOMEOWNERS
Explore prefab ADU options for your California home. Start with your property, available space, and budget. We will help you explore what may fit and how your project could be financed.
For family space, a potential rental, or a place to work.

START WITH YOUR PROPERTY
Tell us where your property is, what you want your ADU to do, and the budget you have in mind. Available space, access and site conditions shape the next conversation.
Explore designs and layouts suited to your goals. Options, availability and specifications must be confirmed with the project provider after property review.
A unit price is one part of your budget. Ask about site work, foundation, utilities, delivery, permits and installation, including what is excluded from the written scope.
BEFORE YOU BUY
$50,000–$155,000 was the middle 50% of Los Angeles declared ADU permit valuations in our October 12, 2025–October 11, 2026 issuance-window analysis (median $86,100; 5,783 permits)—not total installed cost or a prefab-only price range. The 2021 UC Berkeley statewide ADU owner survey reported a $150,000 median construction cost, or $250/square foot, across ADU types; its cost definition includes design, labor, materials and permits, and the projects studied were built in 2018–2019. These are public reference figures, not a quote: separately scoped site work, utility upgrades, fees and design may be outside a permit’s declared valuation.
2021 survey · Official Los Angeles permit source. Permit statistics are ADU Fund Co original analysis.
| Source | Year / window | Figure | What it covers |
|---|---|---|---|
| UC Berkeley statewide ADU owner survey | 2021 publication; 2018–2019 projects | Median $150,000; $250/square foot. 37% below $100,000; 71% below $200,000. | Owner-reported construction spending across ADU types, including design, labor, materials and permits. Historical, not a current prefab quote. |
| City of Los Angeles: original permit-data analysis 5,783 distinct eligible permits | Issued Oct 12, 2025–Oct 11, 2026 | Median $86,100 Middle 50% $50,000–$155,000 | Declared permit/job valuation, not total installed cost. All ADU construction types; 579 records add more than one ADU. Not a per-unit figure. |
| City of San Diego: original permit-data analysis 1,368 distinct eligible permits | Issued Oct 12, 2025–Oct 11, 2026 | Median $149,600.01 Middle 50% $89,430.35–$238,564.80 | Declared permit/job valuation, not total installed cost. All ADU construction types; 401 records add more than one ADU. Not a per-unit figure. |
No component price is assigned without a supporting source or a property-specific written quote.
ADU Fund Co original analysis of official open data, downloaded October 12, 2026. We select permits issued on or after October 12, 2025 and before October 12, 2026; positive ADU-unit change/count; structural building permits; and positive, parseable declared valuation. Los Angeles includes Bldg-New, Bldg-Addition and Bldg-Alter/Repair, using ADU_CHANGED > 0. San Diego includes Building Permit and Combination Building Permit, using APPROVAL_ADU_TOTAL > 0. Current status is not used to discard permits that were issued and then completed.
We exclude descriptions containing the words SUPPLEMENT, SUPPLEMENTAL or SUPPLEMENTARY, deduplicate by permit/approval ID, and exclude conflicting duplicate IDs. The median and 25th–75th percentiles use linear interpolation at (n−1)×p (Type 7). Explicitly labeled supplemental permits are excluded to limit revision-related double counting; this text rule is not a perfect primary-permit flag. Los Angeles: 6,102 positive-ADU candidates, 313 supplemental exclusions and 6 missing/zero/negative valuations, yielding 5,783 records. San Diego: 1,424 candidates and 56 missing/zero/negative valuations, yielding 1,368 records. No duplicate IDs or conflicting IDs remained in either extract.
Observed eligible issuance dates: Los Angeles October 12, 2025–October 10, 2026; San Diego October 13, 2025–October 8, 2026. The analysis window is 12 months, but source refresh lag and missing records may affect coverage. No inflation adjustment or vendor prices are used. The datasets do not identify a reliable prefab-only cohort, completed all-in spending or all separately permitted scopes. These distributions must not be presented as a current installed prefab price range.
For context, the exact-one-ADU sensitivity uses 5,204 Los Angeles permits (median $80,000; middle 50% $45,000–$150,000) and 967 San Diego permits (median $123,424.15; middle 50% $76,622.38–$198,306.99, displayed to cents). These are still permit valuations, not installed quotes. San José publishes active, expired and under-inspection snapshots; a complete 12-month issued cohort was not verified, so no city statistic is estimated.
Download the computed summary CSV (no personal data) · Los Angeles official dataset · San Diego official dataset and downloads · 2021 UC Berkeley report: definitions and methodology · San José snapshot
These are public reference figures, not a quote.
Data last updated: October 12, 2026. Quarterly refresh scheduled; historical survey figures retain their 2021 label.
Ask for a written schedule separating property review, design, permits, fabrication, site preparation, delivery, installation and inspections. Confirm dependencies and contingencies. No project completion timeline is guaranteed here.
Confirm the approval route and property requirements with the local permitting authority before ordering. A factory-built design does not settle site access, foundation, utilities or inspections. Start with the current California HCD ADU handbook and your city’s official ADU resource.
An ADU can create separate living space for family or a potential rental. Confirm permitted use and occupancy with the city. For family, consider privacy and daily access; for a rental, budget for operating costs and vacancy. No rent or return is promised.
Compare available cash with financing options a provider offers for your circumstances. If considering home-equity financing, match available funds to payment milestones and review rates, fees and repayment. A HELOC is secured by your home and usually has a variable rate; inability to repay can put your home at risk.
Sources: California HCD ADU handbook · CFPB: HELOC borrowing and repayment. Checked October 12, 2026. Project checklists are planning guidance; confirm your individual requirements with the appropriate providers.
WHEN YOU ARE READY
Planning to use home equity? Tell us whether you would like to explore financing alongside your ADU options. Your inquiry is not a loan application and does not authorize a credit check.
ADU Fund Co is not a lender and does not make credit decisions. Financing is facilitated through an independent brokerage partner and is subject to lender approval, eligibility, and applicable terms. ADU Fund Co does not charge homeowners a service fee. Third-party fees and financing costs may apply.
EXPLORE MY ADU OPTIONS
Share a few details in two steps. An ADU Fund Co representative will reach out within 24 hours of a saved inquiry.
Property suitability, ADU availability, price and financing are confirmed separately. Please do not send financial documents through this form.
STEP 1 OF 2 · YOUR PROPERTY
An ADU Fund Co representative will reach out within 24 hours.
ADU Fund Co is not a lender and does not make credit decisions. Financing is facilitated through an independent brokerage partner and is subject to lender approval, eligibility, and applicable terms. ADU Fund Co does not charge homeowners a service fee. Third-party fees and financing costs may apply.