Compare quotes with the same checklist
This is a planning checklist, not a list of charges that apply to every property. Have the appropriate provider confirm each item, its cost and its responsible party.
| Budget area | Ask the provider |
|---|---|
| Unit and finishes | Which model, dimensions, fixtures and finish selections are included? |
| Design and permits | Who prepares and submits the property-specific plans? Which fees are estimates? |
| Site and foundation | What survey, grading, foundation or other site work is included or excluded? |
| Delivery and installation | Are transport, access planning, lifting equipment and installation in the scope? |
| Utilities and completion | Who prices connections, inspections and any required finishing work? |
| Funding and reserves | What financing costs, payment timing and contingency allowance should be planned? |
Three useful documents to request
- An itemized quote identifying estimates, exclusions and allowances.
- A responsibility list naming the provider for each project stage.
- A payment schedule showing deposits, milestones and change-order handling.
Does prefab mean the ADU is already approved?
Do not assume a model’s availability resolves your property’s requirements. Ask the provider and the local planning or building department which approvals and site-specific documents are needed. The HCD handbook is a starting point for California’s ADU framework; local review remains important.
Planning for family or rental use
Describe the intended use before selecting a layout. For family, consider access, privacy and daily living needs. For a potential rental, investigate operating expenses, applicable requirements and realistic local demand. Rental income, occupancy and investment returns are not guaranteed.
Where ADU Fund Co fits
We begin with your inquiry and help you explore financing and prefab ADU options. We do not perform permitting or installation. Ask the relevant provider to confirm its exact scope in writing. Our website designs are illustrations, not a model specification or a construction quote.
Compare two prefab quotes on the same scope
Record each quoted amount and whether the item is included, excluded or still unknown. A lower unit price does not establish a lower complete project cost. Keep bundled items identified so you do not count them twice.
Plan supplier payments before committing
Use the supplier’s written contract to identify what triggers each payment and what happens if fabrication, approvals or delivery are delayed. These example milestones are editable prompts, not a supplier payment schedule. Confirm funds with the financing provider; a planned draw or approved line does not guarantee access at every future milestone.
Bring the comparison to your financing conversation
Save your notes on your own device and bring the written quotes to the conversation. These tools do not total a final installed price or establish borrowing eligibility. Use the budget worksheet after clarifying inclusions and exclusions. Do not enter account numbers or borrower documents here.
Sources & scope
Sources checked October 10, 2026. General educational information, not an individual financing recommendation. Loan terms and approval are determined by the lender. ADU Fund Co helps with initial inquiries and next steps.